1 | Plant | Not for producing the flammable, explosive, toxic and hazardous materials | Less than or equal to 2,000m2 | Less than or equal to 12m | Less than or equal to 2 storeys | The workshop is not for labor-intensive production of clothes, toys and shoes. | 1. The span of the steel structure installation works does not exceed 36m. 2. No lifting scaffold or suspended scaffold is equipped. 3. No tower crane is used. | The reconstruction and expansion projects are not within the core area of the capital, or within the range of 30m around the regions of preservation of cultural relics, construction control and those with underground cultural relics. | No military management area, culture relic protection site, school, hospital, residential area, large forest, chemical plant or petrol station within the range of the new and expansion projects | No new technology or process, for which, no national, industrial or local standard has been formulated test, is applied. | Distribution of the fire zones has not been changed. | Not included in the negative list of the comprehensive risk management abilities |
2 | Warehouse | Not for storage of flammable, explosive, toxic or hazardous materials | Less than or equal to 2,000m2 | Less than or equal to 12m | Less than or equal to 2 storeys | Non-crowded place | 1. The span of the steel structure installation works does not exceed 36m. 2. No lifting scaffold or suspended scaffold is equipped. 3. No tower crane is used. | No military management area, culture relic protection site, school, hospital, residential area, large forest, chemical plant or petrol station within the range of the new and expansion projects | No new technology or process, for which, no national, industrial or local standard has been formulated test, is applied. | Distribution of the fire zones has not been changed. | Not included in the negative list of the comprehensive risk management abilities |
3 | Education | Not for chemical experiments or other teaching and scientific research activities | Less than or equal to 2,000m2 | Less than or equal to 12m | Less than or equal to 2 storeys | Not a nursery or kindergarten covering an area exceeding 500m2, a teaching building covering an area over 1,000m2 of a university, a teaching building, a library or a dining hall of a primary or middle school | 1. The excavation depth of the foundation pit does not exceed 3m, the civil, protection and sedimentation works have no influence on the neighboring building. 2.The erection height of the concrete framework support works is below 5m, the erection span is less than 10m, the total load of the construction is below 15KN/M2 or the concentrated line load is below 15KN/M. 3. No lifting scaffold or suspended scaffold is equipped. 4. No tower crane is used. | The reconstruction and expansion projects are not within the core area of the capital, or within the range of 30m around the regions of preservation of cultural relics, construction control and those with underground cultural relics. | No chemical plant or petrol station within the range of the new and expansion projects | No new technology or process, for which, no national, industrial or local standard has been formulated test, is applied. | Distribution of the fire zones has not been changed. The distribution room, the air conditioning room and the central control room of fire fighting have not been removed or reconstructed. | Not included in the negative list of the comprehensive risk management abilities |
4 | Medical service | Not for storage of the corrosive or radioactive medical drugs or instruments, or the toxic and hazardous medical waste | Less than or equal to 2,000m2 | Less than or equal to 12m | Less than or equal to 2 storeys | Not a inpatient building covering an area over 500m2 | 1. The erection height of the concrete framework support works is below 5m, the erection span is less than 10m, the total load of the construction is below 15KN/M2 or the concentrated line load is below 15KN/M. 2. There is no curtain wall works. 3. No lifting scaffold or suspended scaffold is equipped. 4. No tower crane is used. | No culture relic protection site, large chemical plant or petrol station within the range of the new and expansion projects | No new technology or process, for which, no national, industrial or local standard has been formulated test, is applied. | Neither the bearing structure nor the distribution of the fire zones is changed. No fabricated part is used. | Not included in the negative list of the comprehensive risk management abilities |
5 | Culture | Not for cultural or recreational activity of over 50 persons | Less than or equal to 2,000m2 | Less than or equal to 12m | Less than or equal to 2 storeys | Not an exhibition hall of the public gallery or museum, a dancing hall, a video hall, a video hall, a karaoke lounge, a nightclub or a recreation hall covering an area over 500m2 | 1. The erection height of the concrete framework support works is below 5m, the erection span is less than 10m, the total load of the construction is below 15KN/M2 or the concentrated line load is below 15KN/M. 2. There is no steel structure installation works or curtain wall works. 3. No tower crane is used. | The reconstruction and expansion projects are not within the core area of the capital, or within the range of 30m around the regions of preservation of cultural relics, construction control and those with underground cultural relics. | No large public transport hub, large forest, chemical plant or petrol station within the range of the new and expansion projects. | No new technology or process, for which, no national, industrial or local standard has been formulated test, is applied. | Distribution of the fire zones has not been changed, and the distribution room has not been demolished. | Not included in the negative list of the comprehensive risk management abilities |
6 | Sports | Not for holding the sports activities of over 50 persons | Less than or equal to 2,000m2 | Less than or equal to 12m | Less than or equal to 2 storeys | Not a sports venue, hall, profitable indoor gymnasium or leisure venue covering an area over 1,000m2 | 1. The erection height of the concrete framework support works is below 5m, the erection span is less than 10m, the total load of the construction is below 15KN/M2 or the concentrated line load is below 15KN/M. 2. The span of the steel structure installation works does not exceed 36m. There is no figured steel structure member. 3. No lifting scaffold or suspended scaffold is equipped. 4. No tower crane is used. | No Party and government offices, military management area, culture relic protection site or petrol station within the range of the new and expansion projects. | No new technology or process, for which, no national, industrial or local standard has been formulated test, is applied. | Distribution of the fire zones has not been changed, and the distribution room has not been demolished. | Not included in the negative list of the comprehensive risk management abilities |
7 | Facilities for the elders | Not a nursing home | Less than or equal to 2,000m2 | Less than or equal to 12m | Less than or equal to 2 storeys | Not a welfare house covering an area over 1,000 m2 | 1. The erection height of the concrete framework support works is below 5m, the erection span is less than 10m, the total load of the construction is below 15KN/M2 or the concentrated line load is below 15KN/M. 2. No lifting scaffold or suspended scaffold is equipped. 3. There are no curtain wall projects. 4. No tower crane is used. | The reconstruction and expansion projects are not within the core area of the capital, or within the range of 30m around the regions of preservation of cultural relics, construction control and those with underground cultural relics. | No culture relic protection site, large public transport hub, large forest, chemical plant or petrol station within the range of the new and expansion projects. | No new technology or process, for which, no national, industrial or local standard has been formulated test, is applied. | Neither the bearing structure nor the distribution of the fire zones is changed. No fabricated part is used. | Not included in the negative list of the comprehensive risk management abilities |
8 | Tourist facilities | Without the accommodation facilities | Less than or equal to 2,000m2 | Less than or equal to 12m | Less than or equal to 2 storeys | Not a temple or church covering an area over 1,000m2 | 1. No lifting scaffold or suspended scaffold is equipped. 2. There is no curtain wall works. 3. No tower crane is used. | No military management area, culture relic protection site or large forest within the range of the new and expansion projects. | No new technology or process, for which, no national, industrial or local standard has been formulated test, is applied. | Distribution of the fire zones has not been changed, and the distribution room has not been demolished. | Not included in the negative list of the comprehensive risk management abilities |
9 | Hotel | Without a meeting room, a gymnasium or recreational facilities | Less than or equal to 2,000m2 | Less than or equal to 12m | Less than or equal to 2 storeys | Not a hotel above the four star level | 1.The erection height of the concrete framework support works is below 5m, the erection span is less than 10m, the total load of the construction is below 10KN/m2. 2. There is no steel structure installation works, net rack or cable membrane structure installation works. 3. No tower crane is used. | The reconstruction and expansion projects are not within the core area of the capital, or within the range of 30m around the regions of preservation of cultural relics, construction control and those with underground cultural relics. | There is no military management area, culture relic protection site, school, hospital, residential area, large forest, chemical plant or petrol station within the range of the new and expansion projects. | No new technology or process, for which, no national, industrial or local standard has been formulated test, is applied. | Neither the bearing structure nor the distribution of the fire zones is changed. | Not included in the negative list of the comprehensive risk management abilities |
10 | Residential | Without a collective kitchen arranged | Less than or equal to 2,000m2 | Less than or equal to 12m | Less than or equal to 2 storeys | Not a school dormitory or a staff dormitory covering an area over 1,000m2 | 1. The excavation depth of the foundation pit does not exceed 3m. 2. There is no fabricated type building concrete prefabricated part installed at site. 3. No tower crane is used. | No culture relic protection site, chemical plant or petrol station within the range of the new and expansion projects | No new technology or process, for which, no national, industrial or local standard has been formulated test, is applied. | Neither the bearing structure nor the distribution of the fire zones is changed. No fabricated part is used. | Not included in the negative list of the comprehensive risk management abilities |
11 | Commercial buildings | Not for selling flammable, explosive, toxic or hazardous materials | Less than or equal to 2,000m2 | Less than or equal to 12m | Less than or equal to 2 storeys | Not a region of the integrated shopping mall or market | 1. There is no steel structure installation works, net rack or cable membrane structure installation works. 2. The erection height of the concrete framework support works is below 5m, the erection span is less than 10m, the total load of the construction is below 15KN/M2 or the concentrated line load is below 15KN/M. 3. No lifting scaffold or suspended scaffold is equipped. 4. No tower crane is used. | The reconstruction and expansion projects are not within the core area of the capital, or within the range of 30m around the regions of preservation of cultural relics, construction control and those with underground cultural relics. | There is no military management area, culture relic protection site, school, hospital, residential area or petrol station within the range of the new and expansion projects. | No new technology or process, for which, no national, industrial or local standard has been formulated test, is applied. | Distribution of the fire zones has not been changed. The distribution room, the air conditioning room and the central control room of fire fighting have not been removed or reconstructed. | Not included in the negative list of the comprehensive risk management abilities |
12 | Office building | Without a chemical or biological laboratory | Less than or equal to 2,000m2 | Less than or equal to 12m | Less than or equal to 2 storeys | Not a government office building, a power dispatching building covering an area over 1,000m2, a telecommunication building, a post office building, a disaster prevention commanding and dispatching building, a broadcast and television building or an archive building | 1. The erection height of the concrete framework support works is below 5m, the erection span is less than 10m, the total load of the construction is below 15KN/M2 or the concentrated line load is below 15KN/M. 2. There is no steel structure installation works, net rack or cable membrane structure installation works. 3. No tower crane is used. | There is no military management area, culture relic protection site, school, hospital, residential area or petrol station within the range of the new and expansion projects. | No new technology or process, for which, no national, industrial or local standard has been formulated test, is applied. | Distribution of the fire zones has not been changed. The distribution room, the air conditioning room and the central control room of fire fighting have not been removed or reconstructed. | Not included in the negative list of the comprehensive risk management abilities |
| | | | | | | | | | | | | |